Report 36PH0153 the Archaeological Investigations of the Aramingo/Gunner’s Run Canal
Gunners Run
Chapter 1 – Overview
The Pennsylvania Department of Transportation (PennDOT) is undertaking improvements to increase capacity and improve operation and access on Interstate 95 (I-95) between the Vine Street and Girard Avenue Interchanges(Figure 1.1). I-95 currently consists of four lanes in each direction between Vine Street and Girard Avenue. As part of the I-95 Section GIR (I-95/GIR) project, the
Chapter 2 – Historic Context
Chp. 2
Chapter 4 – Results of Phase III Investigations
Chp. 4
Chapter 5 – Synthesis and Conclusions
Chp. 5
Gunner’s Run Artifacts – Gallery
Artifact Gallery
Gunner’s Run Maps – Gallery
Historic Maps & Figures
Gunner’s Run South
Site Page Gunner’s Run South Explore Gunner’s Run South: At the start of the excavation, the site appeared as a combination of bare ground beneath the I-95 viaduct and grass-covered land to the south of the highway. The entire site area was open and featureless, with the exception of a line of small trees along
Report 36PH0153 – Appendix A
Appendix A
Report 36PH0153 – Appendix B
Appendix B
Report 36PH0153 – Appendix C
Appendix C
Report 36PH0153 – Appendix D
Appendix D
Report 36PH0153 – Appendix E
Appendix E
Report 36PH0153 – Appendix F
Appendix F
Report 36PH0153 – Appendix G
Appendix G
Report 36PH0153 – References
References