Shackamaxon #1

The Shackamaxon #1 Site was initially excavated in 2009, with additional testing of peripheral site components completed during construction monitoring in 2014. The site extends on both sides of the I-95 roadway in the Kensington-Fishtown neighborhood, with the densest part identified on the north side of the highway, in what had been the backyard space

T3

Site Page T3 Explore T3: Pre-contact artifacts were identified at depths of between 6 and 7 feet below the present ground surface, and were contained in intact soil deposits encountered between the former machine shop’s reinforced concrete foundations. The T3 Site is an extraordinary example of a significant archaeological site that survived despite impacts from