The following management summary documents the preliminary findings of Phase IB/II archaeological excavations performed as part of the I-95/GIR Improvement Corridor Project for the Pennsylvania Department of Transportation (PennDOT), Engineering District 6-0. These investigations were performed by the URS Corporation (URS) within a portion of the GR-1 section of the larger project area, and specifically within a mixed Native American/Historic Period locus that has been designated the Hope Farm-Richmond Hall Site (site number pending).
36PH0153
Chapter 1 – Overview
The Pennsylvania Department of Transportation (PennDOT) is undertaking improvements to increase capacity and improve operation and access on Interstate 95 (I-95) between the Vine Street and Girard Avenue Interchanges(Figure 1.1). I-95 currently consists of four lanes in each direction between Vine Street and Girard Avenue. As part of the I-95 Section GIR (I-95/GIR) project, the
Chapter 2 – Historic Context
Chp. 2
Chapter 3 – Phase IB/II Survey Results
Chp. 3
Chapter 4 – Results of Phase III Investigations
Chp. 4
Chapter 5 – Synthesis and Conclusions
Chp. 5
Report 36PH0153 – Appendix A
Appendix A
Report 36PH0153 – Appendix B
Appendix B
Report 36PH0153 – Appendix C
Appendix C
Report 36PH0153 – Appendix D
Appendix D
Report 36PH0153 – Appendix E
Appendix E
Report 36PH0153 – Appendix F
Appendix F
Report 36PH0153 – Appendix G
Appendix G
Report 36PH0153 – References
References